Syntic

Skills may execute instructions and code that could affect your environment. Marketplace scans reduce risk but do not guarantee safety. Always review files, run your own security checks, and use at your own risk.

DesignFree Safe

design-sprint

Security Scan Summary

Status: Safe

Source: Syntic Skills registry

Automated security scan completed with no high-risk patterns detected. Manual review is still required.

About This Skill

Use when the user wants to prototype and test a product idea with real users fast, mentions a "design sprint," or a team is stuck debating a high-stakes product decision.

Downloadable SKILL.md

Download SKILL.md and place it in your Syntic skills folder. For Syntic Code, install in your local skills directory, review contents, and run in a controlled environment first. Acknowledge the risk notice above to enable the download.

SKILL.md
---
name: design-sprint
description: Use when the user wants to prototype and test a product idea with real users fast, mentions a "design sprint," or a team is stuck debating a high-stakes product decision.
category: Design
version: 1.0.0
tools: []
---

# Design Sprint Framework

A five-day process for answering critical business questions through design, prototyping, and testing ideas with customers. Developed at Google Ventures and used by Google, Slack, Airbnb, and hundreds of startups.

## Core Principle

**Compress months of debate, design, and testing into one week — and test with real users before writing any production code.** The sprint replaces endless discussion with a fixed Monday-to-Friday spine, hard time-boxes, and a single Decider, so a high-stakes product question gets a real answer in five days instead of five months.

## Scoring

**Goal: 10/10.** Score a sprint plan or execution by awarding 1 point for each item present and correct (10 total). Report the score and the missing items needed to reach 10/10.

1. Decider committed for the full week; one Sprint Master facilitating.
2. Monday produces a target customer and moment, not a vague "test the product."
3. Hard time-boxes used (Crazy 8s in 8 min, 10am-5pm days, no open-ended sessions).
4. Solution sketches done alone and anonymous, no group brainstorming.
5. Wednesday ends with a single Decider Supervote, not consensus.
6. Storyboard specified before any prototype is built.
7. Prototype is Goldilocks-fidelity, testable in 5-15 min, with a trial run done.
8. Exactly 5 target users recruited via screener (6 scheduled to absorb a no-show).
9. Friday uses the Five-Act Interview; users interpret the prototype unexplained.
10. Debrief converts the +/-/~ pattern grid into a decision on next steps.

A plan missing the Decider, real users, or a same-day prototype caps at 6 — those are the failure modes the sprint exists to prevent.

## The 5-Day Sprint Process

```
Monday → Tuesday → Wednesday → Thursday → Friday
  Map      Sketch     Decide      Prototype    Test
```

**Prerequisites:** a big challenge worth a week's focus; a team of Decider plus 4-7 people with diverse expertise; five full days (10am-5pm) with no interruptions; a dedicated room with whiteboards. One **Sprint Master** facilitates, keeps time, and manages energy.

## Monday: Map

**Goal:** Understand the problem and choose a target for the week.

- **Long-term goal:** the optimistic answer to "What do we want to be true in 2 years?" (e.g., "Customers use our product daily").
- **Sprint questions:** list obstacles and unknowns as questions on the whiteboard, whole team contributing (e.g., "Will customers trust us with payment info?").
- **Customer journey map:** list the actors (customer types), then draw the journey left to right in 5-15 steps ("Hears about product → Visits site → Signs up → First use → Regular user").
- **Ask the Experts:** interview teammates with specialized knowledge (CEO, design, engineering, support, sales); capture notes on the whiteboard.
- **How Might We (HMW):** rephrase problems as opportunities — "Customers don't understand pricing" → "HMW make pricing immediately clear?" One per sticky note; vote and organize the best on the map.
- **Target:** choose which customer and moment on the map to focus on — the biggest risk or opportunity. The **Decider** (person with authority) makes the final call.

## Tuesday: Sketch

**Goal:** Generate solutions — each person sketches a detailed solution.

**Morning — Lightning Demos:** 3-minute demos of competitors and analogous products for inspiration ("Here's what I found, here's why it's interesting"), captured on the whiteboard; borrow from any industry. Then divide the map between people if it has multiple parts, or swarm the same critical problem together (most sprints swarm).

**Afternoon — The Four-Step Sketch:** Everyone sketches alone — **no group brainstorming**. Individual work produces better, more diverse ideas.

1. **Notes (20 min):** silently review the map, HMWs, and inspiration.
2. **Ideas (20 min):** rough doodles, mind maps, stick figures — quantity over quality.
3. **Crazy 8s (8 min):** fold paper into 8 panels, sketch 8 variations in 8 minutes — forces you past your first idea.
4. **Solution Sketch (30-90 min):** a 3-panel storyboard (beginning, middle, end), self-explanatory with a catchy title, kept **anonymous**.

## Wednesday: Decide

**Goal:** Critique solutions and choose the best one to prototype and test.

**Morning — Sticky Decision:** **Art museum** (tape sketches to the wall, review silently, mark interesting parts with dot stickers) → **Heat map review** (discuss each sketch for 3 minutes, sketcher stays silent) → **Straw poll** (one non-binding vote each, one sentence rationale) → **Supervote** (Decider gets three dots; their decision wins).

**Afternoon:** If multiple sketches win, choose **Rumble** (competing prototypes testing different approaches) or **All-in-One** (combine the best ideas into one prototype — simpler, and what most sprints do). Then draw a 10-15 panel **storyboard** of the test experience: opening scene (how the customer discovers you) → your solution in action → successful outcome. Keep it simple — stick figures, words, arrows — but specific about the UI, with just enough detail for Thursday's prototype.

## Thursday: Prototype

**Goal:** Build a realistic facade in one day — you need something to test on Friday.

**Mindset:** Fake it; prototype only what you'll test. Aim for Goldilocks fidelity — sketches are too low for honest reactions, working code wastes time. It should look real without working for real (facades, click-throughs, video).

**Roles:** Makers (2+, build the pieces), Stitcher (1, assembles the final prototype in Keynote/Figma), Writer (1, all copy), Collector (1-2, gathers photos/icons/screenshots), Interviewer (1, writes and rehearses Friday's script), Sprint Master (fills gaps, keeps energy up).

**Tools:** Figma, Keynote, or linked PowerPoint slides for web/apps; video walkthrough or 3D-printed mockup for physical products; role-play video for services.

Morning: divide the storyboard into scenes and assign to makers. Afternoon: stitch together, review against the storyboard, rehearse the full flow, and run a trial with someone outside the sprint team.

**Prototype checklist:** follows storyboard exactly; looks real enough for honest reactions; walkable in 5-15 minutes; interviewer rehearsed; trial run completed.

## Friday: Test

**Goal:** Interview 5 customers; learn what works and what doesn't.

**Setup:** interview room with the prototype and a camera recording screen and face; observation room with a live video feed where the team watches and takes notes. One **Interviewer** conducts all five interviews.

**The Five-Act Interview** — about 45 minutes per customer, with 30-minute breaks between to discuss observations and adjust questions:

| Act | Time | What to Do |
|-----|------|------------|
| **1. Welcome** | 5 min | Explain you're testing the prototype, not them; get recording permission; encourage thinking aloud |
| **2. Context** | 5 min | "Tell me how you currently handle [problem]" — mindset and current behavior |
| **3. Introduce prototype** | 5 min | "What's this? What's it for?" Don't explain — let them interpret |
| **4. Tasks/nudges** | 15 min | Open-ended exploration, then storyboard tasks; when stuck, ask "What would you do next?" — don't help |
| **5. Debrief** | 5 min | "What did you think? Who's this for? What was confusing?" |

**Five is the magic number:** patterns emerge after 3-5 people and returns diminish after 5, and five interview-plus-break slots fit one day. Recruit via a screener survey; offer an incentive ($100-$200 B2B, $50-$100 B2C).

**Pattern Recognition:** capture observations in a grid, one column per customer, marking each ✓ (positive), ✗ (negative), or ~ (mixed). After five interviews, count marks per row and look for shared patterns.

**End-of-sprint debrief:** organize findings into ✓ what worked, ✗ what failed, ~ mixed, then decide next steps:

- **Core concept validated:** build it, or run the next sprint on details
- **Major issues:** pivot, or sprint again on the problems
- **Total failure:** back to the drawing board — you just saved months

## When to Run

**Run when:** the decision is high-stakes, there's no time to build and test normally, the team is stuck in endless debate, multiple solutions compete, it's a new product/feature/major redesign, or you need to de-risk before investing. **Don't run when:** the problem/solution is obvious, the team isn't bought in, or you can't get the Decider for the full week.

**Variations:** 4-Day Sprint (Day 1 Map+Sketch compressed, Day 2 Decide, Day 3 Prototype, Day 4 Test); Remote Sprint (same schedule, Miro/FigJam + Zoom); Multi-Sprint (Sprint 1 chooses direction, Sprint 2 deep-dives the solution, Sprint 3 refines details).

## Common Mistakes

| Mistake | Why It Fails | Fix |
|---------|-------------|------|
| **Skip prototyping** | Nothing to test | Always prototype, even if simple |
| **Over-engineer prototype** | Wastes time on details that don't matter | Facade only, not working code |
| **Test with wrong users** | Invalid feedback | Screen for target customers |
| **Explain prototype to users** | Confusion is the data | Run Acts 3-4 as written, unaided |
| **No decision maker** | Can't commit | Get Decider for full week or don't sprint |
| **Interruptions** | Breaks focus | Protect the week, no meetings/emails |

## Quick Diagnostic

| Question | If No | Action |
|----------|-------|--------|
| Decider committed for full week? | Sprint will fail | Get commitment or postpone |
| Problem important enough? | Waste of time | Only sprint on big challenges |
| Can prototype in 1 day? | Wrong problem for sprint | Choose more concrete problem |
| Can recruit 5 target users? | Can't test properly | Start recruiting 2 weeks ahead |
| Team commits to no interruptions? | Won't maintain focus | Get buy-in from leadership |

Based on the Design Sprint methodology by Jake Knapp, John Zeratsky, and Braden Kowitz (*Sprint: How to Solve Big Problems and Test New Ideas in Just Five Days*).

Bundle Download

Includes SKILL.md and bundled support files where provided. Risk acknowledgement is required.

Install Targets

Syntic App

  1. 1. Create a dedicated folder for this skill in your local skills library.
  2. 2. Place SKILL.md into that folder.
  3. 3. Restart Syntic and invoke this skill on matching tasks.

Syntic Code (CLI)

  1. 1. Save SKILL.md in your local Syntic Code skills directory.
  2. 2. Keep related files in the same skill folder.
  3. 3. Run in a safe environment and validate outputs.

Source

https://github.com/wondelai/skills/blob/main/design-sprint/SKILL.md

Open Source Link
Design

Related Skills